|
Pioneer Way Pump Station
City of Puyallup, Washington
Engineer: Kennedy Jenks Consultants
Replacement of an existing wastewater pumps station with a new below grade cast-in-place
concrete pump station utilizing Wemco hydrostal pumps. The project required extensive
dewatering, auger cast piling and a sheetpile cofferdam.
|