South Treatment Plant Raw Sewage Pump and Drives Replacement
King County, Washington
Harbor Pacific Contractors, Inc.
Harbor Pacific Contractors, Inc.
Harbor Pacific Contractors, Inc.
Harbor Pacific Contractors, Inc.
Motor for Pump No. 1 being hoisted into place

Harbor Pacific has completed the replacement of two of the three raw sewage pumps. The final pump is scheduled for installation in March 2017. The pumps range in size and pumping capacity with flows of 60 to 110 million gallons per day (MGD).